Packaging drop test machine operating specifications and maintenance

1. Packing drop test machine wiring: Connect the supplied battery cable to the three-phase battery and ground it. Connect the control box and the test machine with the connection cable that is randomly connected according to the plug fitting condition, and try to increase/decrease. command. (If you press the up button but run down during the test run or press the down button to run up, just change the phase number at the battery.

2. Drop height adjustment: turn on the host battery, set the height required for the test (the method is as follows), press the up button to reach the set height; if it stops in the middle, it must reach the set height before the reverse can be performed. Run command

3. Place the object to be tested on the operating table and fix it with a fixed rod;

4. The package drop test machine presses the up button to raise the measured object to the set height;

5. Press the drop button to make the operating table instantly deviate from the measured object, and the measured object will be free to fall;

6. Press the reset button to return the operation console to the operating state;

7. Repeat the above steps if the test is repeated.

8. After the test: press the lower button to make the operation table work to the lowest position to close the battery button;

Packing drop test machine precautions and maintenance

1. After each test is completed, the falling arm must be dropped to avoid the long-reset drop arm to deform the spring, which affects the test effect. Before each drop, please reset the motor before stopping to press the drop button;

2. After the new machine is installed in the factory, it is necessary to add appropriate low-concentration oil to the sliding round rod. It is strictly forbidden to add anti-rust oil or high-concentration oil and backlog with corrosive oil.

3. If there is too much dust in the oiling station, please lower the machine to the lower part, wipe the previous oil, and then heavy oil;

4. The packaging drop test machine is an impact mechanical device. When the new machine is used more than 500 times, each screw must be tightened to avoid malfunction.

5. The lifting shaft and chain of the packaging drop test machine should be regularly lubricated.

6. The gear reducer will change the oil once every six months.

7. All batteries should be cut off during operation to ensure the cleaning of the lifting shaft.

8. Non-operators must not operate the machine at will.

Packaging drop test machine operating specifications and maintenance

Packaging drop test machine operating specifications and maintenance

Packaging drop test machine operating specifications and maintenance

Hair Dryer 2000W

It is new latest design 2000W Hair Dryer. it comes with hot and cool function and also comes with hi and low function . so it have dual switch control. that is not comes with other.in today's day and age, it comes with good quality and low price. so all can afford it. From room occupying appliances and pocket-fitting devices, to meters and meters of cables, no home is stranger to any of these.

Ionic Ceramic Hair Dryer,Compact & Lightweight Hair Dryer,Rechargeable Wireless Hair Dryer,Ionic Blow Hair Dryer

Ningbo Meirou Electric Appliance Co.,Ltd. , https://www.mrhairdryer.com